Printable checklist
Install-day checklist
A one-page checklist your install crew can run on every countertop install — from truck loading to customer sign-off.
Tip: use Ctrl/Cmd + P to print or save as PDF.
Before leaving the shop
- All pieces pulled for the job — verify counts against the layout
- Slabs / pieces match the approved material and lot
- Sink, cooktop, faucet, and hardware on the truck
- Seam kit, epoxy, anchors, shims, silicone, and color-matched caulk
- Tools charged: saws, polishers, vacuums, levels, laser
- Job folder / digital layout open on the shop tablet
- Confirmed install window with the customer today
On arrival
- Walk the job with the customer — confirm scope is unchanged
- Verify cabinet level, plumb, and structurally sound
- Check appliances on site match the cutout specs
- Confirm water and power are disconnected where needed
- Photograph existing conditions before anything moves
- Clear the path: floors protected, doorways padded
Install
- Dry-fit every piece before any seams or glue
- Verify overhangs, reveals, and overhang support brackets
- Check sink and cooktop cutouts against the fixtures in place
- Confirm splash heights and scribe to walls
- Seam: clean, align, color-match, clamp, and profile
- Level across every run — shims as needed
- Undermount sinks: support, clip, and seal per spec
Cleanup and walkthrough
- Full wipe-down of all tops and splash
- Remove tape, shims, film, and all trash — leave nothing behind
- Demonstrate care basics to the customer
- Customer walks every counter, seam, and edge
- Punch list captured on the spot, with photos
- Customer sign-off — signature or photo of approval
- Install photos uploaded to the job for the shop record
Running installs from a shared plan means the shop, the field, and the customer all see the same status. See how Lithiq OS handles scheduling and install checklists — or grab the field measure sheet for the templating side.